Architect(s): B2Ai | VenhoevenCS
Address: Warandelaan 14B, WETTEREN, Belgium
Latitude/Longitude: 51.004788,3.894767
Photographs: Filip Dujardin
The De Warande master plan provides a dynamic and cohesive framework for a multiplicity of activities with sufficient flexibility to respond to future changes and developments.
The plan focuses above all on experiencing the area as a park. A distinction has been made between two areas: a park with recreational functions along routes, and a strip with a high density of sports and relaxation functions. A large part of De Warande was behind fencing of all shapes and sizes. For much of the year a large part of De Warande is not accessible to the public. The superfluous fences have been removed to turn De Warande back into a park.
By fencing only the lawn around the outdoor swimming pool, the park will remain open in summer to other visitors. Outside the outdoor swimming pool season, large gates in the hedge will be open to make the entire area accessible to sports enthusiasts and recreationists. The landmarks will be the impressive villa, the new sports hall, robust groups of trees and exceptional solitary spots set against a wooded background. The relationship between the different activities and the park is extremely important. Lines of sight and recreational routes through the existing landscape and architectural elements will reinforce the cohesion in the park. The trees have been positioned in a way that allows them to support the lines of sight and follow the curves in paths. This will ensure that besides its spatiality the park will also be socially safe.
Architecture
The sports hall has been designed as a covered part of the park, with lines of sight to and views of the different spaces, activities and visitors inside and outside the building. The centrally located catering area is visible from all sides and offers a panorama across the whole park. The building is a complete an attractive sports environment with numerous possibilities and modern facilities. The transparent entrance hall makes the gymnasium visible from the front square. The building acts like a sign for sports and games.
Engineering
Sustainability and energy are integral parts of the master plan. Construction of the new sports hall and phase 1 of the park will lay the foundations for a smart grid. A combined heat and power plant has been installed to meet the heating requirements of the indoor and outdoor swimming pools. The plant will further provide some of the electricity needed for the swimming pool and other functions on the domain. The sports hall has been equipped with an air/water heat pump for floor heating and a solar boiler to produce hot water for the sanitary facilities. Toilets are being flushed with rainwater to make the most economical use possible of water. The superfluous rainwater of the buildings and the metalled surfaces around the sports hall will be used to keep the pond water at the right level. The car park has been constructed with drainage bricks enabling rain to infiltrate the site.
Text description provided by the architects.
Client: Autonoom Gemeente Bedrijf (AGB)
Area surface: 7,5ha
Gross floor area: 4.411m²
Architecture: VenhoevenCS architecture+urbanism, Amsterdam (designing architect)
Architecture: BURO II & ARCHI+I, Brussel (executive architect)
Structural conception: Ney & Partners nv, Brussels
Structural work: Ingenium nv, Bruges
Acoustics: Technum Acoustics & Dynamics, Mechelen
Contractor: nv STRABAG Belgium, Antwerp
Closed shell construction: nv STRABAG Belgium, Antwerp
PJ floor: 4M
Exterior joinery: Awtotaal
Windows: Vandenrijse
Fixed furniture: Carpincasais
Loose furniture: De Moor
Landscape architect: Marie-Laure Hoedemakers
Garden: Wulteputte
Contributed by B2Ai